Description: Dozer with operator at $160 an hour after the clearing is done. Pads are grubbed so no root ball sits under the slab. We stop at rough grade: no concrete, wells or septic.
Category:
Tag: site prep, dirt work, house pad
Description: Dozer with operator at $160 an hour after the clearing is done. Pads are grubbed so no root ball sits under the slab. We stop at rough grade: no concrete, wells or septic.
Category:
Tag: site prep, dirt work, house pad